Vertical position

I find that I have to scroll down in my timeline a lot. There are some long scale events displayed at the top and some shorter far below them which I currently need. Every time I open my project or simply add or remove a split view, the focused part of the timeline jumps to the top again. It remembers the horizontal position but not the vertical position. I can live with that after reopening a project, but with every opened or closed split it is getting annoying.